MAIN WATER PIPELINE FROM KAMAL-SALEH DAM TO ARAK CITY
• Client: Markazi Regional water Authority
• Consultant: Lar Consulting Engineers
• Contract Date: 2004
Project specification
To supply industrial water for “Arak petrochemichal complex”,”Shazand power plant”and potable water of Arak city,Kamal-Saleh dam and the related pipeline.
The project contains following parts:
·Pipeline: Steel pipe dia 1100 mm to 1500 mm with 78 km length
Reservoir: Two water reservoir with 2000 m3 capacity each
Major activity and quantities
· Earthwork 900,000 m3
· Reinforcement 700 ton
· Concrete 7,500 m3