Industry and Engineering Corporation, IEC is associated with engineering and construction of major civil, environmental and industrial Engineering projects, involving the most advanced engineering and construction technology in the implementation of the aforementioned developments. IEC’s affiliated companies in Turkey (Serik Marina, Antalya Shopping Center and Canal Istanbul projects), in Azerbaijan (Water transfer from Aras river to Tabriz, Kerman Water Transfer Project and Khuzestan Water Projects) in UK (Eynsham housing project) and (Globally financing IEC corporation’s affiliated companies) in Kyrgyzstan (CASA1000 Hydropower project), in the Kazakhstan ( South Kazakhstan region’s project, Almaty Grand Ring Road Project, G4City project, SEZ (Khorgos Eastern Gates) Pharmaceutical plant and Astana’s rain water accumulation project), is involved in Park Ankara Development Project and (Road construction in Ukraine, modern health city in Kiev, Underground railway construction in Dnipro and Highway construction between Hungary and Romania) are involved together with its joint venture international and local companies in designing, financing and construction process. .


IEC TABRIZ

IEC TABRIZ

New Page 1

Water Supply to Northern-East and Eastern Cities of
Urumia Lake region
Summarized Project Outline



1. Objective

The main objective of this project is to provide, treat, transfer and supply potable water to Tabriz City and also other cities such as Marand, Soufian, Shabestar, Tasouj, Aras free zone … and other rural areas along the pipeline route. The destination year of water supply is 2046.

2. Project Layout

The Project includes water intake, pump stations, water treatment plants, reservoirs, and pipelines.

Water intake is located at Golfaraj region in E-Azarbaijan province at N-W side Jolfa City and a distance of 0.700km from it towards Aras Dam, in the vicinity of the local radio station at elevation of about 710m above sea level. A sedimentation basin and the first pump house will be located in front of water intake within a farming unsmooth land which to be leveled and prepared for construction.

The main Pipeline Route starts from the first pump station and move ahead along the high voltage power lines towards Gharebolaghe Village then at vicinity of Dounedaghe heights and in front of Yekan-Saadi Village it turns towards Marand City and Piresaghe Village and enters balancing reservoir at 1555m above sea level. From water intake up to the balancing reservoir there are totally six of pump stations which provide required pressure for transferring water to the relevant elevation. From that point, pipeline route pass neighboring Zaal Vilage and crossing Marand-Jolfa road then enters balancing reservoir at 1520m above sea level. From that point, pipline proceeds along Tabriz- Marand main road and ahead of Marand City it turns towards New Bonab City and passes through a tunnel up to Shourderagh village and then proceeds to Soufian- Tabriz main road and after crossing the road, it will be extended along Soufian- Marand road up to Soufian City, then cross Soufian-Tasouj road and keep on along existing service road of gas pipeline towards Tabriz City up to the Tabriz Airport, then after crossing Tabriz to Soufian road, it extends to the Northern-east reservoir at the highlands overlook Tabriz Airport.

3. Regional Climate

Regional climate main features are shown in following table indicates a cold and dry steppe climate of the region:
 

TableNo.1: Climaticconditionsofthe Projectenvironment

Item

 

 

Location

 

Ave. Precipitatio n(mm/yr)

 

Max temp. (C)

 

 

Ave. temp.(C)

 

Min temp. (C)

 

Max Humidi ty(%)

Yearly

Ave. Humidity

(%)

1

Jolfa

(water  intake)

 

199.0

 

34.9

 

14.8

 

-4.8

 

74

 

54

2

Marand

(midway)

 

338.3

 

31.0

 

12.7

 

-5.1

 

72

 

51

7

Tabriz(endof

theroute)

 

299.9

 

32.7

 

12.0

 

-5.7

 

72

 

54

 

4. Population and Water Demands

Population to be covered and water demand of project area and finally related water balance are as follow:
 

 

TableNo.2: Populationandwaterdemandofthe Projectdistricts

 

Designyear

 

Nodes

 

Population

Yearly water

demand

(mcm/y)

Projectwater

allocation

(mcm/y)

 

 

2026

Cities& Rural

Areas

 

2698283

 

226

 

38

Industries

-

180

68

Total

2698283

406

106

 

 

2036

Cities& Rural

Areas

 

3182524

 

268

 

112

Industries

-

212

72

Total

3182524

480

184

 

 

2046

Cities& Rural

Areas

 

3537999

 

296

 

165

Industries

-

246

75

Total

3537999

542

240

 

Considering the reliable existing surface and ground water resource of the region, the amount of water demand that shall be covered by this project should be 240mcm/y treated water or 244mcm/yr raw water.

5. Water Resource

The water resource of this project is Aras River Water Intake that is located near Radio Station at elevation of 710m above sea level at the North-West of Jolfa City in E-Azerbaijan Province.
 

6. Water Treatment Plant

Raw water will be pumped through six successive pump stations to the balancing reservoir plus a distinct pump station up to the tunnel inlet from which flows through the tunnel and enters water treatment plant located downstream of tunnel outlet near to Shourderaghe Village, which consists of Centrifloc Clarifiers, Centrifuge mechanical dewatering and related accessories.

According to the maximum water allocation of 6.6m3/sec, the process of water treatment is divided into two modules. Each module has a capacity of
3.3m3/sec treated water outflow.



7. Pipeline and Service Road

The main pipeline route started from water intake pumping station No.(1), and considering total route of pipeline, its overall length is about 139km which consists of 5.5km tunnel plus 133.5km pipeline.

Size of main pipes is DN2000 made of carbon steel at grades St44-II with relevant thickness of 15.88mm.

Specification of main pipes is mentioned in following table:
 

 

TableNo.3: Mainpipelinespecification

Item

Section

of main pipe line

Elevation of upstream reservoir (m)

Elevation ofdown- stream reservoir (m)

 

 

Start

(km+m)

 

 

End

(km+m)

 

 

Pipe material

 

Pipe size (mm)

 

Pipe thickness (mm)

1

1st

850

713

0+000

5+600

St44-II

2000

15.88

2

2nd

982

850

5+600

16+300

St44-II

2000

15.88

3

3rd

1122

982

16+300

22+200

St44-II

2000

15.88

4

4th

1264

1122

22+200

28+000

St44-II

2000

15.88

5

5th

1409

1264

28+000

32+200

St44-II

2000

15.88

6

6th

1555

1409

32+200

35+900

St44-II

2000

15.88

7

7th

1520

1555

35+900

54+300

St44-II

2000

15.88

8

8th

1456

1520

54+300

88+600

St44-II

2000

15.88

9

9th

1570

1456

88+600

90+500

St44-II

2000

15.88

10

10th

1565

1570

90+500

96+000

tunnel

11

11th

1550

1565

96+000

97+200

St44-II

2000

15.88

12

12th

1470

1540

97+200

139+100

St44-II

2000

15.88

 

All steel pipes of all 12 sections should be cement mortar lined. All pipes of all sections should be coal tar enamel medium grade coated. Total length of pipeline should equipped by Cathodic Protection system.

8. Service Road

The pipeline route is mostly accessible throughout its length via a suitable service road of Golfaraj Project however the remaining its length is also located along existing access roads therefore only small parts of the route will need service road construction.

9. Reservoirs and Pumping Stations

Due to static elevation difference of 855 m between water level of water intake and highest point of main pipeline route, 7 pumping stations with relevant rated head have been considered. From the highest reservoir down to the water treatment plant, there is one midway balancing reservoir. Water will flow straight from water treatment plant up to the storage reservoir in Tabriz City.
Complete working conditions of reservoirs are shown in following table.
 

 

TableNo.5:Reservoirsandpumpstations ofthe Project

Item

 

Reservoir

 

Pump

Station

 

Location

(km+m)

Elevation

of

reservoir

(m)

Flow rate (lit/s)

 

Capacity

(m3)

Pumping head(m)

Installed power (kw)

1

Suc.Res-01

PS-01

0+000

713

7000

30000

151

14400

2

Suc.Res-02

PS-02

5+600

850

7000

20000

157

14400

3

Suc.Res-03

PS-03

16+300

982

7000

20000

156

14500

4

Suc.Res-04

PS-04

22+200

1122

7000

20000

158

14500

5

Suc.Res-05

PS-05

28+000

1264

7000

20000

158

14500

6

Suc.Res-06

PS-06

32+200

1409

7000

20000

158

14500

7

Bal.Res-01

-

35+900

1555

7000

60000

-

-

8

Bal.Res-02

-

54+300

1520

7000

90000

-

-

9

Suc.Res-07

PS-07

88+600

1456

6600

20000

122

11700

10

WTP

-

97+200

1540

6200

2x30000

-

-

Total

-

-

-

360000

-

98500

 
10. Required Power

Amount of required electrical power for this project is estimated to be98.5mw for main pipeline pump stations. Required power for final water treatment plant will be 1565kw.



11. Control & Telemetry

Main control room will be located at final treatment plant. All necessary apparatuses and instrumentation for control, monitoring and telemetry system for water pipeline elements and equipment will be provided in order to keep convenient and better operation of system in safe mode. Control and monitoring of hydraulic data such as flow rate, pressure, level and power actuator situation and interlock, collecting required data analyzing and finally commanding is the main aim of this system. Data transferring system will be through optical fiber.

12. Cost Estimation on July 2013

Total costs of each part of the project are estimated as follows

Table No. 7: Cost Estimation of the Project parts on July 2013
 

Item

Mainparts

Firstsectionfromintake to Bal. Res.1(Euro)

Secondsection

FromBal. Res.1

ToTabriz

(Euro)

1

Constructionofmainwaterintake

9, 378,910.00

-

2

Supply,manufacturing,transportation,

Constructionofmainpipeline(totally133km)

79,184,798.00

215,178,994,00

3

Constructionofmaintunnel(totally5.5km)

-

45,956,659,00

4

Constructionofmainaccessroads

9,378,910.00

14,068,365.00

6

Constructionofmainreservoirs

28,136,730.00

24,117,197.00

7

Supply,manufacturing,transportation,

Constructionofpumpstations.

235,008,690.00

66,590,261,00

8

Supply,manufacturing,transportation,

Constructionofwatertreatmentplant

-

134,788,336.00

10

ControlandTelemetry

4,689,455.00

11,522,660.00

11

Total

365,777,493.00

512,222,475.00

12

GRAND TOTAL

877,946,005.00Euro

 

 

 

 