Failed to load licensing components!

Please RE-INSTALL / REPAIR SKIN! DO NOT UNINSTALL THEME which will cause unrecoverable data loss!

News IEC

IEC has been designing and constructing pipeline installations for over thirty years in locations around the regions. 

WATER TREATMENT PLANT OF BILESAVAR

 

WATER TREATMENT PLANT OF BILESAVAR

 

• Client: east azarbaijan & Ardebil regional water authority
• Consultant: abran consulting engineers co.
• Contract data: 2000
Plant main specification

· Capacity: 120 lit/ sec with future extension capability of 180 lit/ sec

· Plant system : non – gravity ( pressure) rapid treatment

Related

Tags

Categories

Share

Post a Comment