Register
Login
home IEC
About Us
CERTIFICATION
Subsidiary Companies
Partner companies
Divisions
Housing and Bulding
LSF Building System
Transportation Systems
Highway and Bridge Engineering
Rail way Engineering
Metro and Tunneling Projects
Ports and Harbors
Airports
Water and Waste Water
Energy resources
Solar Energy
Wind Energy
Dams and Hydro-power Energy
Fossil Fuel Energy
Oil and Gas
SERVICES
Investment Management
Management & Engineering (Consultancy Services)
Construction
Construction Material
Operations Maintenance & Logistics
CAREERS
MACHINERY
Organisation Chart
Professional and Technical Resource
Lists of professional staffs in projects
News
Contact Us
Failed to load licensing components!
Please RE-INSTALL / REPAIR SKIN! DO NOT UNINSTALL THEME which will cause unrecoverable data loss!
IEC NEWS
Click [Settings] button to set the relationship between the current module and data module
Dams frequently form the key component of a water engineering project. The Dams and River Engineering Department within IEC has experience in the planning, design and construction of dams which spans 30 years. Our rang of projects have encompassed single
and multipurpose dams constructed for water supply, flood alleviation, hydroelectric power generation, irrigation and ground water recharge
Cham Asseman
SuperUser Account
|
7/11/2018 12:54:00 PM
|
(0)
Comments
|
(540) View Count
|
Return
Cham Asseman
This run-of-the-river dam is located on the famous Karun River some 160 km from the provincial capital, Ahwaz. As one of the cascade dams on Karun, the main objective of the project is generation of 2000 MW of hydroelectric power, while the relatively small reservoir is sufficient for the provision of potable water for the adjacent city of Masjed-e-Soleyman.
Tablieh, as the leading member of the Tablieh–Perlite Joint Venture was responsible for over 80% of the project civil works (both above and underground) in the context of various subcontracts from the Korean-Japanese main contractors, the Daelim–Sato Joint Venture.
Location
Khuzestan Province
Client
Iran Water & Power Resources Development Co.
Consultant
Nippon Koei (Japan) -Moshanir- Lahmeyer International (Germany)
Main contractor
Daelim-Sato Joint Venture
Plunge Pool, Tail Pond Dam, Tailrace Tunnel, Bifurcation & Penstocks, Left Thrust Block
Dam Height
177 m
Crest Length
497 m
Concrete
1,100,000 m3
Excavation
21,230,000 m3
Embankment
14,000,000 m3
Reinforcement
45,000 Tons
Related
Construction of the Underground Powerhouse Complex-Uma Oya Multipurpose
7/12/2018
Cham Asseman
7/11/2018
Seymareh Hydropower Plant
7/11/2018
Masjed-e-Soleyman HEPP
7/11/2018
Shahid Rajaee Dam
7/11/2018
EXCAVATION AND CONSOLIDATION OF GOTVAND HYDRO POWER PLANT (PC)
7/11/2018
Tags
Categories
About the Author
Share
Post a Comment
Name
*
Email
*
WebSite
Comment
*