Register
Login
home IEC
About Us
CERTIFICATION
Subsidiary Companies
Partner companies
Divisions
Housing and Bulding
LSF Building System
Transportation Systems
Highway and Bridge Engineering
Rail way Engineering
Metro and Tunneling Projects
Ports and Harbors
Airports
Water and Waste Water
Energy resources
Solar Energy
Wind Energy
Dams and Hydro-power Energy
Fossil Fuel Energy
Oil and Gas
SERVICES
Investment Management
Management & Engineering (Consultancy Services)
Construction
Construction Material
Operations Maintenance & Logistics
CAREERS
MACHINERY
Organisation Chart
Professional and Technical Resource
Lists of professional staffs in projects
News
Contact Us
Failed to load licensing components!
Please RE-INSTALL / REPAIR SKIN! DO NOT UNINSTALL THEME which will cause unrecoverable data loss!
IEC NEWS
Click [Settings] button to set the relationship between the current module and data module
Dams frequently form the key component of a water engineering project. The Dams and River Engineering Department within IEC has experience in the planning, design and construction of dams which spans 30 years. Our rang of projects have encompassed single
and multipurpose dams constructed for water supply, flood alleviation, hydroelectric power generation, irrigation and ground water recharge
Masjed-e-Soleyman HEPP
SuperUser Account
|
7/11/2018 12:42:00 PM
|
(0)
Comments
|
(606) View Count
|
Return
Masjed-e-Soleyman HEPP
This run-of-the-river power plant with an installed capacity of 1000 MW (250×4, with a reserved extension capacity of another 1000 MW) having the generation capacity of 3700 million KWh of annual energy was entirely excavated and completed by Tablieh as part of it’s subcontract for the Korean-Japanese Joint Venture, Daelim-Sato JV. Tablieh was acting as the leading member of the Tablieh-Perlite JV.
Powerhouse Cavern:
Size: 155m (L) ×30m (W) ×49m (H)
4 Units of Francis type turbine generator(250MW)
Transformer Cavern:
Size: 110 m (L) ×14 m (W) ×23 m (H)
Pressure Shafts , Upper & Lower Vertical Bends:
Size: L=558 m Dia=9 m
Tailrace Tunnels:
Size: L=760 m Dia=11 m
Vent Shaft & Gallery:
Shaft size: H=121 m Dia=5.6 m
Gallery size: L=74 m Dia=5.6 m
SF6 Shaft & Bus Gallery:
Shaft: H=98 m Dia=6 m
Gallery: L=70 m Dia=6 m
Power Intake
Size: L= 120 m W= 42 m H= 45.5 m
Power Outlet
Size: L= 162 m W=34.5 m H= 48.5 m
Location
Khuzestan Province
Client
Iran Water & Power Resources Development Co.
Consultant
Nippon Koei (Japan) -Moshanir-
Lahmeyer International (Germany)
Main contractor
Daelim-Sato Joint Venture
Scope of work:
Tunnel
4.7 km
Excavation
450,000 m3
Concrete
139,500 m3
Related
Construction of the Underground Powerhouse Complex-Uma Oya Multipurpose
7/12/2018
COFFERDAM & DIVERSION SYSTEM OF DOOSTI
7/11/2018
Seymareh Hydropower Plant
7/11/2018
Hello world!
7/11/2018
EXCAVATION AND CONSOLIDATION OF GOTVAND HYDRO POWER PLANT (PC)
7/11/2018
DAMS AND HYDROPOWER
7/11/2018
Tags