Failed to load licensing components!

Please RE-INSTALL / REPAIR SKIN! DO NOT UNINSTALL THEME which will cause unrecoverable data loss!

IEC NEWS

Click [Settings] button to set the relationship between the current module and data module

Dams frequently form the key component of a water engineering project. The Dams and River Engineering Department within IEC has experience in the planning, design and construction of dams which spans 30 years. Our rang of projects have encompassed single
and multipurpose dams constructed for water supply, flood alleviation, hydroelectric power generation, irrigation and ground water recharge

GILAN-E-GHARB EARTH FILL DAM PROJECT (PC)

GILAN-E-GHARB EARTH FILL DAM PROJECT (PC)

 

Starting Date 1996
Finishing Date 1998
Tunnel length 380 m
Cofferdam Earthfill 200,000 m³
Height 60 m
Crest Length 900 m
Crest Width 10 m
Resevoir vol 35 Mm³

GILAN-E-GHARB EARTH FILL DAM PROJECT (PC)

 
Starting Date 1996
Finishing Date 1998
Tunnel length 380 m
Cofferdam Earthfill 200,000 m³
Height 60 m
Crest Length 900 m
Crest Width 10 m
Resevoir vol 35 Mm³

Related

Tags

Categories

Share

Post a Comment